Churchill Murals Come at Right Time

Churchill has been through some tough times lately. Floods resulting from two huge March blizzards have eroded nearly 20 sections of train track from Gillam to Churchill. Eighteen artists from around the world have journeyed to Churchill for the ocean conservation event known as Sea Walls Festival. A couple of the artists have come from as far away as Brazil and New Zealand. With them comes the hope and inspiration this town needs!

Sea Walls mural in Churchill. Alex De Vries – Magnifico photo.

“I just think it’s really amazing to be mindful of communities like this,” said New Zealand artist Elliot O’Donnell, who makes art under the name Askew One.

“We live in a world that is increasingly refocused around city life, and we forget sometimes about the people who live in these really remote places and just kind of how delicate the situation is.”

The artists involved in this project hope to bring awareness to the importance and urgency of protecting the world’s oceans. Part of that protection process involves global warming and its effects on the rest of our habitat.

Churchill Sea Walls murals

A grand mural takes shape in Churchill. Alex De Vries – Magnifico photo.

“It’s the ocean that connects us so our relationship with the ocean is very important, and it’s also a very precarious sort of relationship,” stated O’Donnell.

Churchill, on the edge of civilization in the north of Manitoba, has had extreme weather conditions this spring leading to the destruction of a major lifeline of the town, the Hudson Bay Line.Without this transport mode Churchill faces rising costs in food, fuel and other vital supplies to the community. With airplanes the only mode of transportation at the moment, costs will rise for shipping.

Churchill Sea Walls mural

A mural adorns Miss Piggy outside of Churchill. Alex De Vries – Magnifico photo.

The delicate relationship between community and environment is something many of the artists are portraying in their murals. And with the current conditions getting worse we need all the extra motivation and inspiration we can get. Happiness through hope can be conveyed through these unique artworks.

“That’s the underlying tension in this town. It’s the drama under all the stories. It’s really about this kind of symbiotic relationship between man and nature here,” he said.

The Sea Walls festival will run through June 26.

Omnitrax Can’t Fix Rail Line Alone

Hudson Bay Line washout

One of the Hudson Bay Line’s washouts between Gillam and Churchill. Omnitrax photo.

Omnitrax does not have the resources to repair the Hudson Bay Railway and is urging the Canadian Government to get involved to help get the trains running again according to Merv Tweed, President of the company’s Canada management team.

“We’ve said publicly that we believe the province and the federal government have to be involved in this. It is a natural disaster,” Omnitrax Canada president Mervin Tweed said Friday.

Omnitrax is claiming there are at least 24 track sections between Gillam and Churchill, Manitoba that were severely damaged during the spring thaw and floods. Given the complexity of accessing the tracks and the permafrost base they lay on, the company is forecasting spring 2018 as the earliest time the repairs will be completed.

Hudson Bay Rail line Churchill

Flooding has caused some of the Hudson Bay Rail line to be underwater. Omnitrax photo.

Omnitrax has conducted aerial photo surveillance revealing long stretches of water submerged tracks, culverts displaced and suspended tracks above the ground with water running under them. This type of damage will be difficult to repair with expediency and forethought for future flood damage.

The Canadian government has not committed to any help before knowing what the costs will be.

“I mean, they’re being cautious. It’s hard to do something until you know — like us — what it’s going to cost,” said Tweed.

Merv Tweed Omnitrax

Omnitrax-Canada President Merv Tweed says government needs to be involved in repairing the rail line. CBC photo.

The Hudson Bay Railway is a lifeline between Churchill and the south. Trains typically bring up everything from fresh groceries to propane gas for heating homes. as well as building materials and anything else needed by residents and businesses. Without this service the economy and lifestyle in Churchill will be drastically affected.

The assessment, including 300 kilometers of tracks, 28 bridges and 600 culverts is beginning this week will take four weeks to analyze the tracks and two more to provide a comprehensive report detailing the process of repairing the line.

Tweed estimates the cost will be far larger than what Omnitrax can afford for the project.

“We don’t believe we have the resources to rebuild what needs to be done,” said Tweed. “Every time we go out we find something else.”

A difficult job ahead for engineers includes walking along the tracks and checking the stability of the line as well as taking soil samples in order to determine ground conditions under the tracks.

“Just getting to that site is going to be a real challenge,” Tweed said.

The tundra north of Gillam is saturated and many areas are covered with water slow to be absorbed by the permafrost – covered ground.

In the meantime, while the track is unusable north of Gillam, a  plan to utilize both the Port of Churchill and the town’s airport is being assessed and put in place to cover the shipping deficiency.

Tweed stated that some port, owned by Omnitrax,  employees have returned to work in preparation for aiding with additional shipments.

“We were optimistic about a pretty good rail season until the water hit,” Tweed said.

Hudson Bay Rail Line Closes – Churchill Layoffs Loom

Owner and operator Omnitrax has shut down the Hudson Bay Rail line for the forseeable future due to flooding causing destruction of the tracks. Estimates for reopening are now being projected as far out as next spring.

The “unprecedented and catastrophic” damage will take months to repair, said Peter Touesnard, chief commercial officer at OmniTrax, the Denver-based owner of the rail line that brings supplies into Churchill. “Until we are able to get people physically on the ground and do a proper inspection, it’s difficult for us to truly know [how long repairs will take],” Touesnard.stated.

The closure is also straining the local economy and workforce preparing for the summer beluga whale season. Businesses are being forced to consolidate their work staff as the number of tourists traveling to Churchill this summer will be drastically reduced. News of at least five layoffs so far has spread and more are expected soon with the official announcement of the rail line suspension.

Tundra inn Churchill

Tundra Inn owner Belinda Fitzpatrick in front of her restaurant. Hannah Manczuk photo.

Belinda Fitzpatrick, owner of the Tundra Inn had to deliver the bad news to five workers last Saturday. “Quite heartbreaking,” said Fitzpatrick. “It was really upsetting.”

Plans for a seasonal restaurant at the Tundra Inn slated to open next week had to be put on the back burner. Other businesses are facing the same challenges as the the closure becomes a reality.

Fitzpatrick has been calling guests and seeing if they are able to fly to Churchill instead. However, cancellations have been coming in and she estimates she will lose a majority of travelers planning to stay at the inn and hostel.

OmniTrax is reporting unprecedented and catastrophic damage to the rail line caused by heavy flooding resulting from heavy snow pack left over from two massive March blizzards. The company says the track gravel bed has been washed out in 19 locations along the line. At least five bridges have visible damage and assessments of 600 culverts and around 30 more bridges will need to be examined for structural integrity.

Churchill flooding

Flooding in the Churchill area and south along the rail line have forced its closure. Ricci O’connor photo.

“While the Hudson Bay Railway requires significant seasonal maintenance, the extent of the damage created by flooding this year is by far the worst we have ever seen,” Touesnard said.

Fuel for the town is an especially critical commodity, and while the port could be used, at least during the ice-free season, winter will pose another extreme hurdle and potential emergency for all of Churchill.

Home hardware churchill Manitoba

Home Hardware in Churchill under stress from the rail line closure. Facebook photo.

Dale de Meulles and his wife Rhoda have run Churchill’s hardware and lumber store for the past 14 years and with the train out they will be unable to stock lumber and other building and home supplies sufficiently. Although competition in town is not there, they will have a tough time meeting expenses and payroll for 10 staff people without money coming in.

“We don’t know how we’re going to survive, to be honest,” said Rhoda de Meulles.

Dale de Meulles gives two months as a deadline for the layoffs. Last year’s Port of Churchill layoffs have already put pressure on the workforce in the town and the rail closure will continue that strife. Seasonal workers will also be hit hard without the tourism dollars coming in.

“We’re trying our best to keep them,” he said. “They gotta feed their families just like everybody else.”

“We’re just trying to survive.”

“As a Churchillian, we will never give up,” de Meulles said. “We’ve had so many hurdles in front of us and we keep jumping over them, but we need help this time.”

Churchill Floods Cause Havoc on Train Service

 

Churchill flooding

Flooding at Churchill’s Goose Creek subdivision. Riccki O’Connor photo.

Nobody really thought ahead when the massive blizzards were pounding Churchill this past March. When the spring thaw came, permafrost has prevented meltwater from permeating the soil and has lead to major flooding in parts of the tundra from Thompson to Churchill along the Hudson Bay rail line.

Once again, as was during the time of the blizzards, supplies and groceries have been delayed due to lack of train service to the northern community. During the March storms groceries were stranded in the south for three weeks leading to a state of emergency.

“With the spring melt underway, water is everywhere”, said Mayor Mike Spence. “We’ve got historic record water flows coming into our community here. It’s a lot of water coming down,”.

Not expected to peak until early June, the Churchill River, as of last weekend, was flowing at about 160,000 cubic feet per second (cfs). With ice still on the Churchill River the flow of overrun onto land can be unpredictable due to tidal flow and ice jamming along shore.

The Goose Creek subdivision has been flooded up river and volunteers have been furiously filling and placing sandbags to try to contain the water. The tracks over parts of the 100 mile stretch of the Hudson Bay rail line have been completely flooded over and no trains have been through since May 23rd.

“We have a rail problem here where we are not able to use the train system because of damage to the rail line, so that needs to be attended to, and that actually can’t be attended to until the water conditions are dealt with.” stated Spence.

Churchill is working with Thompson’s Calm Air, to work out plans to fly groceries into town as soon as possible!

Pin It on Pinterest